Tiszavirág "Mayflower" pedestrian and cyclist bridge, Szolnok

  • Implementer:
    KÖZGÉP Zrt.
  • Execution time:
    2009-2011.

Contractor: KÖZGÉP Zrt.

Structure: steel arch bridge

Length: 186 m

Spans (m): 24,00+120,00+24,00+18,00

Steel: 400 t

Years of construction: 2009-2011.

Activities

Gallery