Pentele Bridge flood bridge N. 4.

  • Implementer:
    KÖZGÉP Zrt.: alvállalkozó
  • Execution time:
    2004-2007.

Pentele Bridge – M8 motorway bridge over the Danube in Dunaújváros– Manufacturing and on-site erection of flood bridge N. 4.

Contractor: KÖZGÉP Zrt.: subcontractor

Structure: steel girder bridge with orthotropic desk

Length: 1065 m

Steel: 5848 t