II. Rákóczi Ferenc bridge over Tisza, Vásárosnamény (building the new bridge and demolition of the old bridge structure)
Contractor: KÖZGÉP Zrt.: consortium member
Structure: three-span steel bridge
Steel structure: 950 t
Years of construction: 2011-2012.