Refurbishment of Szabadság (Liberty) Bridge

  • Implementer:
    KÖZGÉP Zrt., konzorciumi tag
  • Execution time:
    2007-2009.

Renovation of the Szabadság Bridge with monumental reconstruction, replacement of drinking water pipelines

Contractor: KÖZGÉP Zrt.: consortium member

Structure: steel bridge

Steel structure: 600 t

Years of construction: 2007-2009.

Activities

Gallery