Refurbishment of Margit bridge, Budapest

  • Implementer:
    KÖZGÉP Zrt., konzorciumvezető
  • Execution time:
    2009-2011.

Structural and monumental reconstruction of Margit (Margaret) bridge, Budapest

As the leader of Mh2009 Consortium, KÖZGÉP Company performed the reconstruction of the deteriorated structure of Margit bridge and the reconstruction of the tram track structure. The consortium had to ensure that during the works, trams maintain service over the bridge using temporary tracks.

Contractor: KÖZGÉP Zrt.: consortium leader

Length: 552 m

Spans (m): 94,8+88,7+92,5+92,5+88,7+94,8

Steel structure: 3830 t

Years of construction: 2009-2011.

Awards: In 2012, refurbishment of Margit bridge was awarded by ECCS Steel Bridges Award (as best bridge refurbishment).