Deák Ferenc bridge (Southern M0 bridge over Háros Danube)

  • Implementer:
    KÖZGÉP Zrt,. konzorciumi tag
  • Execution time:
    2010-2012

Contractor: consortium member

Structure: steel girder bridge with orthotropic deck

Length: 770 m

Steel: 4800 t

Years of construction: 2010-2012.

Activities

Gallery